CAUSE ANALYSIS OF TUBE-BURST IN FINAL-STAGE SUPERHEATER OF BOILER EQUIPPED FOR SUPERCRITICAL 600 MW UNIT AND PREVENTIVE MEASURES THEREOF
|更新时间:2025-09-28
|
CAUSE ANALYSIS OF TUBE-BURST IN FINAL-STAGE SUPERHEATER OF BOILER EQUIPPED FOR SUPERCRITICAL 600 MW UNIT AND PREVENTIVE MEASURES THEREOF
Thermal Power GenerationVol. 40, Issue 7, Pages: 81-83(2011)
作者机构:
广东珠海金湾发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK223.32
Published:2011
稿件说明:
移动端阅览
CHENG Zhihong Guangdong Zhuhai Jinwan Power Generation Co Ltd. CAUSE ANALYSIS OF TUBE-BURST IN FINAL-STAGE SUPERHEATER OF BOILER EQUIPPED FOR SUPERCRITICAL 600 MW UNIT AND PREVENTIVE MEASURES THEREOF[J]. Thermal power generation, 2011, 40(7): 81-83.
DOI:
CHENG Zhihong Guangdong Zhuhai Jinwan Power Generation Co Ltd. CAUSE ANALYSIS OF TUBE-BURST IN FINAL-STAGE SUPERHEATER OF BOILER EQUIPPED FOR SUPERCRITICAL 600 MW UNIT AND PREVENTIVE MEASURES THEREOF[J]. Thermal power generation, 2011, 40(7): 81-83.DOI:
CAUSE ANALYSIS OF TUBE-BURST IN FINAL-STAGE SUPERHEATER OF BOILER EQUIPPED FOR SUPERCRITICAL 600 MW UNIT AND PREVENTIVE MEASURES THEREOF
The situation of tube-burst due to oxide skin fall-off leading to blockage in final-stage superheater of Jinwan Power Generation Co Ltd has been presented.From aspects of maintenance and operation etc.for the boiler
preventive measures for controlling oxide skin formation and fall-off in the superheater
such as replacing tubes
controlling steam temperature
reducing heat deviation in combustion
controllng temperature rising speed
controlling temperature reducing speed
and strictly controlling water quality for cold and hot water flushing etc.