STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
|更新时间:2025-09-28
|
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
Thermal Power GenerationVol. 40, Issue 5, Pages: 69-72(2011)
作者机构:
广州粤能电力科技开发有限公司
作者简介:
基金信息:
DOI:
CLC:TK223.7
Published:2011
稿件说明:
移动端阅览
LI Xinhu Guangzhou Yueneng Electric Power Science and Technology Development Co Ltd. STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT[J]. Thermal power generation, 2011, 40(5): 69-72.
DOI:
LI Xinhu Guangzhou Yueneng Electric Power Science and Technology Development Co Ltd. STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT[J]. Thermal power generation, 2011, 40(5): 69-72.DOI:
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT
摘要
分析了超超临界1 000 MW机组锅炉无炉水循环泵(BCP)吹管蒸汽超温的原因
提出了在吹管过程中提高给水温度、降低锅炉燃料量和炉膛出口烟气温度
防止过热蒸汽带水等控制蒸汽温度的措施。实施后
可将蒸汽温度控制在锅炉吹管的要求范围内
实现了超超临界1 000 MW机组锅炉在无BCP条件下的顺利吹管。
Abstract
The causes leading to overtemperature of steam used for pipe-blowing under condition without boiler water circulating pump(BCP) for ultra-supercritical 1 000 MW unit have been analysed
and steam temperature controlling measures in the process of pipe-blowing
such as enhancing the feed-water temperature
reducing fuel quantity of boiler
lowering the flue gas temperature at exit of the furnace
and preventing carry over in superheated steam etc.
being put forward.After impementation
the steam temperature can be controlled into a range suitable to requirements in pipe-blowing of the boiler
realizing successfully the pipe-blowing under condition without BCP for ultra-supercritical 1 000 MW unit.