A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS
|更新时间:2025-09-28
|
A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS
Thermal Power GenerationVol. 40, Issue 5, Pages: 1-4(2011)
作者机构:
华能国际电力股份有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.3
Published:2011
稿件说明:
移动端阅览
PENG Dawei, CHEN Feng, ZHANG Jingwu, et al. A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS[J]. Thermal power generation, 2011, 40(5): 1-4.
DOI:
PENG Dawei, CHEN Feng, ZHANG Jingwu, et al. A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS[J]. Thermal power generation, 2011, 40(5): 1-4.DOI:
A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS
The situation of localization for manufacturing power generation equipments used in Huaneng Power Plants has been presented and reviewed.The rapid development of power generation equipments used in Huaneng Power Plants
from technologies being initially imported from abroad and being manufactured at home to all being domestically researched
designed and manufactured
from capacity of unit being 300 MW to capacity of 1 000 MW
and from unit of subcritical parameter to unit of ultra-supercritical parameter
has been achieved.At present
the indices of units
such as condition of equipments
efficiency in operation
and coal consumption in power generation etc.
all have reached the advanced level over the world.In addition to the entire units
the localization of manufacturing auxiliary equipments and parts
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
CAUSES LEADING TO ASH CLOGGING IN AIR PREHEATER AND DISPOSAL MEASURES THEREOF
ANALYSIS ABOUT INFLUENCE OF BANKING FIRE IN 300 MW CFB BOILER UPON THE UNIT
ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF
Thermal economic analysis for adding low-temperature economizer in boilers
Related Author
CHANG Shi-ji
ZHANG Lin
LI Yang-chun Huaneng Changxing Power Generation Co Ltd
HE Ying-guang Datang Honghe Power Generation Co Ltd
YE Shan-pei1
WANG Chun-chuang21.Guangqian Electric Power Co Ltd