DEBUGGING TEST OF COMBUSTION OPTIMIZATION AND RESULT ANALYSIS FOR ONE 1177t/h CFB BOILER
|更新时间:2025-09-28
|
DEBUGGING TEST OF COMBUSTION OPTIMIZATION AND RESULT ANALYSIS FOR ONE 1177t/h CFB BOILER
Thermal Power GenerationVol. 41, Issue 1, Pages: 53-55(2012)
作者机构:
1. 陕西新元洁能有限公司
2. 华能清洁能源技术研究院
作者简介:
基金信息:
DOI:
CLC:TK229.6
Published:2012
稿件说明:
移动端阅览
YANG Yong1, LIU Haifeng2, WANG Haitao2, et al. DEBUGGING TEST OF COMBUSTION OPTIMIZATION AND RESULT ANALYSIS FOR ONE 1177t/h CFB BOILER[J]. Thermal power generation, 2012, 41(1): 53-55.
DOI:
YANG Yong1, LIU Haifeng2, WANG Haitao2, et al. DEBUGGING TEST OF COMBUSTION OPTIMIZATION AND RESULT ANALYSIS FOR ONE 1177t/h CFB BOILER[J]. Thermal power generation, 2012, 41(1): 53-55.DOI:
DEBUGGING TEST OF COMBUSTION OPTIMIZATION AND RESULT ANALYSIS FOR ONE 1177t/h CFB BOILER
摘要
对1 177t/h循环流化床(CFB)锅炉进行的燃烧优化调整试验结果表明
经燃烧优化调整
锅炉热效率平均为92.232%
比调整前提高约1.5%~2.0%
每年可节约燃料成本约840万元;稀相区烟气速度由调整前的4.22m/s降至3.87m/s
可减少磨损量约25%。
Abstract
The debugging test of combustion optimization on one 1 177 t/h CFB boiler has been carried out.Results show that the thermal efficiency of said boiler after combustion optimization and adjustment has enhanced about 1.5%~2%
the flue gas velocity in dilute-phase zone has decreased from 4.22 m/s before adjustment to 3.87 m/s
the abrasion has reduced about 25%
the electric current of the primary air fan
the secondary air fan
and the induced draft fan has decreased from about 1 350 A before test to 1 240~1 280 A