您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF TUBE-BURST ON LOW-TEMPERATURE REHEATER OF BOILER NO.5 IN ONE POWER PLANT
更新时间:2025-09-28
    • CAUSE ANALYSIS OF TUBE-BURST ON LOW-TEMPERATURE REHEATER OF BOILER NO.5 IN ONE POWER PLANT

    • Thermal Power Generation   Vol. 40, Issue 10, Pages: 88-91(2011)
    • CLC: TK228
    • Published:2011

    移动端阅览

  • HAO Dongfu Guangdong Yuedian Power Generation Co Ltd. CAUSE ANALYSIS OF TUBE-BURST ON LOW-TEMPERATURE REHEATER OF BOILER NO.5 IN ONE POWER PLANT[J]. Thermal power generation, 2011, 40(10): 88-91. DOI:

  •  
  •  

0

Views

92

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF TUBE-BURST IN LOW-TEMPERATURE REHEATER
CAUSE ANALYSIS AND PREVENTIVE MEASURES FOR TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF BOILERS
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK

Related Author

HU Lin-ming1
LONG Hui-guo2
LI Guang21.Hunan Provincial Electric Power Testing & Research Institute
GAO HuiYangcheng Power Generation Co Ltd
HU Min
RAO Supo
LUO Sheng
ZHANG Yu jie

Related Institution

Loudi Special Equipment Inspection Institute
Hunan Electric Power Test and Research Institute
Yangcheng Power Generation Co., Ltd
Shajiao C Power Plant
Guangdong Yuedian Group Co., Ltd.
0