STUDY ON AND PRACTICE OF PIPE-BLOWING USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATION PUMP FOR ONCE-THROUGH BOILER OF ULTRA-SUPERITICAL 1 000 MW UNIT
更新时间:2025-09-28
    • STUDY ON AND PRACTICE OF PIPE-BLOWING USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATION PUMP FOR ONCE-THROUGH BOILER OF ULTRA-SUPERITICAL 1 000 MW UNIT

    • Thermal Power Generation   Vol. 40, Issue 7, Pages: 74-77(2011)
    • CLC: TK229.2
    • Published:2011

    移动端阅览

  • CUI Zhendong1, LI Xinhu1, YIN Fengjun2 1.Electric Power Science Research Institute under Guangdong Power Grid Corporation. STUDY ON AND PRACTICE OF PIPE-BLOWING USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATION PUMP FOR ONCE-THROUGH BOILER OF ULTRA-SUPERITICAL 1 000 MW UNIT[J]. Thermal power generation, 2011, 40(7): 74-77. DOI:

  •  
  •  

0

Views

134

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TECHNICAL FEATURES OF PIPE-BLOWING ON ULTRA-SUPERCRITICAL 660 MW UNIT IN JINGGUANGSHAN POWER PLANT
COMPARISON OF STRUCTURAL DESIGN FOR THREE 1000 MW STEAM TURBINES
OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT
STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT
STUDY ON THE CONTROL MODEL OF INTERMEDIARY POINT TEMPERATURE IN BOILER OF ULTRA-SUPERCRITICAL UNIT BASED ON DYNAMIC MECHANISM ANALYSIS

Related Author

FU Longlong
MA Xiaolong
XIN Junfang
ZHAO Jingtao Xi'an Thermal Power Research Institute Co Ltd
ZHU Bao-tianXi'an Thermal Power Research Institute Co Ltd
ZHU Jiang-tao
ZHU Jie-nan
GAO Jin-yao

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Guohua Zhejiang Energy Generation Co., Ltd
Guodian Taizhou Power Generation Co., Ltd
Department of Automation, Wuhan University
School of Power and Mechanical Engineering, Wuhan University
0