ENQUIRY INTO AND ANALYSIS OF INSTALLATION MODE WITHOUT MOTOR-DRIVEN FEED-WATER PUMPS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS
|更新时间:2025-09-28
|
ENQUIRY INTO AND ANALYSIS OF INSTALLATION MODE WITHOUT MOTOR-DRIVEN FEED-WATER PUMPS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS
Thermal Power GenerationVol. 40, Issue 5, Pages: 5-9(2011)
作者机构:
浙江国华浙能发电有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2011
稿件说明:
移动端阅览
FENG Liguo, FU Renjie Zhejiang Guohua Zheneng Power Generation Co Ltd. ENQUIRY INTO AND ANALYSIS OF INSTALLATION MODE WITHOUT MOTOR-DRIVEN FEED-WATER PUMPS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS[J]. Thermal power generation, 2011, 40(5): 5-9.
DOI:
FENG Liguo, FU Renjie Zhejiang Guohua Zheneng Power Generation Co Ltd. ENQUIRY INTO AND ANALYSIS OF INSTALLATION MODE WITHOUT MOTOR-DRIVEN FEED-WATER PUMPS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS[J]. Thermal power generation, 2011, 40(5): 5-9.DOI:
ENQUIRY INTO AND ANALYSIS OF INSTALLATION MODE WITHOUT MOTOR-DRIVEN FEED-WATER PUMPS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS
In the light of existing installation experiences of large-capacity ultra-supercritical units from abroad
and combining with the requirements in start-up and operation of ultra-supercritical 1 000 MW units
a tentative idea of eliminating motor-driven feed-water pumps for ultra-supercritical 2×1000 MW units in second-phase project of Zhejiang Guodian Ninghai Power Plant has been put forward.Through analysis of start-up mode without motor-driven feed-water pump for ultra-supercritical 1 000 MW unit
it is believed that the installation mode without motor-driven feed water pump is feasible for newly constructed units
however
it is necessary to have more than three units in one power plant.