ANALYSIS AND TEST OF PARAMETERS' OPTIMIZATION FOR SLIDING PRESSURE OPERATION OF SUPERCRITICAL 600 MW UNIT
|更新时间:2025-09-28
|
ANALYSIS AND TEST OF PARAMETERS' OPTIMIZATION FOR SLIDING PRESSURE OPERATION OF SUPERCRITICAL 600 MW UNIT
Thermal Power GenerationVol. 40, Issue 10, Pages: 50-54(2011)
作者机构:
河南电力试验研究院
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2011
稿件说明:
移动端阅览
ZHOU Zhiping, FAN Xin, LI Ming, et al. ANALYSIS AND TEST OF PARAMETERS' OPTIMIZATION FOR SLIDING PRESSURE OPERATION OF SUPERCRITICAL 600 MW UNIT[J]. Thermal power generation, 2011, 40(10): 50-54.
DOI:
ZHOU Zhiping, FAN Xin, LI Ming, et al. ANALYSIS AND TEST OF PARAMETERS' OPTIMIZATION FOR SLIDING PRESSURE OPERATION OF SUPERCRITICAL 600 MW UNIT[J]. Thermal power generation, 2011, 40(10): 50-54.DOI:
ANALYSIS AND TEST OF PARAMETERS' OPTIMIZATION FOR SLIDING PRESSURE OPERATION OF SUPERCRITICAL 600 MW UNIT
The reasonable selection of sliding pressure operation parameters for supercritical units has been theoritically analysed.Through comparison and test of different parameters under various operation conditions of the supercritical 600 MW unit manufactured from Dongfang Steam Turbine Works and equipped in one power plant
the optimal sliding pressure operation curve has been obtained.Under the new sliding pressure operation mode
the heat consumption rate of said steam turbine has been effectively reduced
while under load of 360 MW
the effectiveness of energy-saving on said unit is most remarkable.Besides
under load of 300 MW
the optimal main steam pressure in winter season is 15.8 MPa