STUDY ON PARAMETERS' CONTROL IN OPERATION OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
更新时间:2025-09-28
    • STUDY ON PARAMETERS' CONTROL IN OPERATION OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT

    • Thermal Power Generation   Vol. 40, Issue 6, Pages: 44-48(2011)
    • CLC: TK227.1
    • Published:2011

    移动端阅览

  • YANG Lei1, LI Qianyu2, WEN Zhiqiang11.North China Electric Power Science Research Institute Co Ltd. STUDY ON PARAMETERS' CONTROL IN OPERATION OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2011, 40(6): 44-48. DOI:

  •  
  •  

0

Views

302

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST STUDY ON OPERATION OPTIMIZATION ADJUSTMENT OF BOILERS ALLOCATING VORTEX BURNERS ON THE FRONT WALL
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS

Related Author

CHEN Binghua1
LI Yujun1
WANG Zhiwei2 1.Huaneng Rizhao Power Plant
HU Min
RAO Supo
LUO Sheng
ZHANG Yu jie
Wu Ping lin

Related Institution

Huaneng Rizhao Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Shajiao C Power Plant
Guangdong Yuedian Group Co., Ltd.
0