ANALYSIS OF RUN BACK TEST AFTER MAJOR REPAIR OF 1000 MW UNIT NO6 IN GUOHUA NINGHAI POWER PLANT
|更新时间:2025-09-28
|
ANALYSIS OF RUN BACK TEST AFTER MAJOR REPAIR OF 1000 MW UNIT NO6 IN GUOHUA NINGHAI POWER PLANT
Thermal Power GenerationVol. 41, Issue 1, Pages: 56-60(2012)
作者机构:
浙江省电力试验研究院
作者简介:
基金信息:
DOI:
CLC:TK267
Published:2012
稿件说明:
移动端阅览
CHEN Xiaoqiang, LUO Zhihao, YIN Feng Zhejiang Provincial Electric Power Testing and Research Institute. ANALYSIS OF RUN BACK TEST AFTER MAJOR REPAIR OF 1000 MW UNIT NO6 IN GUOHUA NINGHAI POWER PLANT[J]. Thermal power generation, 2012, 41(1): 56-60.
DOI:
CHEN Xiaoqiang, LUO Zhihao, YIN Feng Zhejiang Provincial Electric Power Testing and Research Institute. ANALYSIS OF RUN BACK TEST AFTER MAJOR REPAIR OF 1000 MW UNIT NO6 IN GUOHUA NINGHAI POWER PLANT[J]. Thermal power generation, 2012, 41(1): 56-60.DOI:
ANALYSIS OF RUN BACK TEST AFTER MAJOR REPAIR OF 1000 MW UNIT NO6 IN GUOHUA NINGHAI POWER PLANT