APPLICATION OF 37 t/h AIR-WATER COMBINED SLAG COOLER ON CFB BOILER FOR 300 MW UNIT
|更新时间:2025-09-28
|
APPLICATION OF 37 t/h AIR-WATER COMBINED SLAG COOLER ON CFB BOILER FOR 300 MW UNIT
Thermal Power GenerationVol. 40, Issue 6, Pages: 85-88(2011)
作者机构:
山西平朔煤矸石发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK229.6
Published:2011
稿件说明:
移动端阅览
LI Yongmao Shanxi Pingshuo Power Generation Co Ltd. APPLICATION OF 37 t/h AIR-WATER COMBINED SLAG COOLER ON CFB BOILER FOR 300 MW UNIT[J]. Thermal power generation, 2011, 40(6): 85-88.
DOI:
LI Yongmao Shanxi Pingshuo Power Generation Co Ltd. APPLICATION OF 37 t/h AIR-WATER COMBINED SLAG COOLER ON CFB BOILER FOR 300 MW UNIT[J]. Thermal power generation, 2011, 40(6): 85-88.DOI:
APPLICATION OF 37 t/h AIR-WATER COMBINED SLAG COOLER ON CFB BOILER FOR 300 MW UNIT
The air-water combined slag cooler or called basket slag cooler is commonly adopted for CFB boilers to cool the bottom slags.The main faults occurred on 37 t/h air-water combined slag cooler and their causes have been analysed
and measures
such as reasonably controlling the bed pressure in operation
optimizing the sequence of starting the slag cooler up and putting it into operation
as well as controlling the particle size of fuel coal
and controlling the air flow rate and slag-entering amount in operation etc.
being put forward.After implementation
the faults occurred in slag cooler
including clogging in slag-intaking pipe
and unsmooth slag-discharging from the slag cooler have been basically resolved
ensuring continuous and stable operation of the slag cooler.