CAUSE ANALYSIS OF OUTPUT CAPACITY REDUCING FOR INTEGRATED MEMBRANE WATER TREATMENT SYSTEM AND SOLVING SCHEME THEREOF
|更新时间:2025-09-28
|
CAUSE ANALYSIS OF OUTPUT CAPACITY REDUCING FOR INTEGRATED MEMBRANE WATER TREATMENT SYSTEM AND SOLVING SCHEME THEREOF
Thermal Power GenerationVol. 40, Issue 11, Pages: 84-86(2011)
作者机构:
1. 西安热工研究院有限公司
2. 西北电力建设调试施工研究所
3. 河南质量技术监督培训中心
作者简介:
基金信息:
DOI:
CLC:TM621.8
Published:2011
稿件说明:
移动端阅览
FENG Tieling1, CHEN Zefeng2, ZHANG Xiaodie3, et al. CAUSE ANALYSIS OF OUTPUT CAPACITY REDUCING FOR INTEGRATED MEMBRANE WATER TREATMENT SYSTEM AND SOLVING SCHEME THEREOF[J]. Thermal power generation, 2011, 40(11): 84-86.
DOI:
FENG Tieling1, CHEN Zefeng2, ZHANG Xiaodie3, et al. CAUSE ANALYSIS OF OUTPUT CAPACITY REDUCING FOR INTEGRATED MEMBRANE WATER TREATMENT SYSTEM AND SOLVING SCHEME THEREOF[J]. Thermal power generation, 2011, 40(11): 84-86.DOI:
CAUSE ANALYSIS OF OUTPUT CAPACITY REDUCING FOR INTEGRATED MEMBRANE WATER TREATMENT SYSTEM AND SOLVING SCHEME THEREOF
摘要
某电厂全膜法水处理系统在运行中出现膜块污堵、出力不足等问题
通过检查设备、分析水质和膜表面沉积物等发现
其原因为膜元件受到了有机物、生物和金属氧化物的混合污染
其中生物污染是造成超滤和反渗透系统清洗效果不明显的主要原因。对此
提出了加强进水监测、及时清洗等措施。
Abstract
The phenomena of pollutant clogging in membrane blocks and insufficient output capacity occurred in operation of integrated membrane water treatment system of one power plant.Through inspection of equipments
analysis of deposits on the membrane surface
it is discovered that the membrane elements are subjected to mixed pollution of organic matters
biomass
and metal oxides
among them
the biomass pollution is the main cause resulting in non-substantial effectiveness in cleaning of the ultrafiltering and reverse-osmosis systems
for this
corresponding measures
such as strengthening the influent water quality monitoring
STUDY ON LOAD UNDER ECONOMIC OPERATION OF ULTRA-SUPERCRITICAL UNITS
NON-DESTUCTIVE INSPECTION OF AUTOMATIC WELDING DEFECTS FOR BOILER PIPES WITH SMALL DIAMETER AND LARGE WALL-THICKNESS IN ULTRA-SUPERCRITICAL UNITS
CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF
STRENGTH ANALYSIS OF HOT EXTRUDED TEE-TYPE UNEQUAL-DIAMETER THREE-WAY JOINT FOR MAIN STEAM PIPELINE OF ULTRA-SUPERCRITICAL UNIT
MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS
Related Author
LEI Zhao-tuanXi’an Thermal Power Research Institute Co Ltd