您当前的位置:
首页 >
文章列表页 >
DEVELOPMENT AND APPLICATION OF EMULATION SYSTEM ON ULTRA-SUPERCRITICAL 1000MW UNITS
更新时间:2025-09-28
    • DEVELOPMENT AND APPLICATION OF EMULATION SYSTEM ON ULTRA-SUPERCRITICAL 1000MW UNITS

    • Thermal Power Generation   Vol. 40, Issue 11, Pages: 76-77(2011)
    • CLC: TM621.3;TP391.9
    • Published:2011

    移动端阅览

  • ZHOU Dongyang, WEI Xiang, CAI Baoling, et al. DEVELOPMENT AND APPLICATION OF EMULATION SYSTEM ON ULTRA-SUPERCRITICAL 1000MW UNITS[J]. Thermal power generation, 2011, 40(11): 76-77. DOI:

  •  
  •  

0

Views

170

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
STUDY ON VARIATION BEHAVIOR OF OPERATIONAL PARAMETERS FOR ULTRA-SUPERCRITICAL 1000 MW UNITS
COMPARISON STUDY ON TWO TYPES OF PURE ELECTRO-HYDRAULIC REGULATION SYSTEM USED FOR SMALL TURBINE OF FEED-WATER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
APPLICATION OF FIELDBUS IN CONTROL SYSTEM OF WATER NETWORK FOR 1000 MW UNIT
OPTIMIZATION OF WATER SUPPLYING AND FLUSHING MODE FOR BOILER OF ULTRA-SUPERCRITICAL 1000 MW UNIT

Related Author

CHEN Jian-xian
TAO Lei Guodian Beilun Power Plant
CHEN Guoqiang1
LIU Yonglin2
LIU Jiping2
ZHOU Daotong2
YAN Junjie2 1.North-west China Electric Power Design Institute
SHI Lingling

Related Institution

Guodian Beilun Power Plant
School of Energy and Power Engineering, Xi'an Jiaotong University
Northwest Electric Power Design Institute
Guangdong Power Grid Corporation Electric Power Science Research Institute
China Power Investment Pingdingshan Luyang Power Generation Co., Ltd
0