您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF THE CONTROL SYSTEM FOR CFB BOILER OF 330MW UNIT
更新时间:2025-09-28
    • OPTIMIZATION OF THE CONTROL SYSTEM FOR CFB BOILER OF 330MW UNIT

    • Thermal Power Generation   Vol. 40, Issue 11, Pages: 71-75(2011)
    • CLC: TK223.7
    • Published:2011

    移动端阅览

  • ZHANG Zhenwei1, SANG Yongfu1, SONG Jiye2 1.Xi'an Thermal Power Research Institute Co Ltd. OPTIMIZATION OF THE CONTROL SYSTEM FOR CFB BOILER OF 330MW UNIT[J]. Thermal power generation, 2011, 40(11): 71-75. DOI:

  •  
  •  

0

Views

127

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

BRIEF DESCRIPTION OF THE NEGATIVE PRESSURE CONTROL SYSTEM FOR BOILERS IN SECONDPHASE PROJECT OF HUANENG FUZHOU POWER PLANT
Application of generalized predictive control algorithm in selective non-catalytic reduction flue gas denitrification system
Numerical study on concentration distribution of particles in a supercritical CFB boiler furnace during circulating loop interruption
Online soft measurement of NOx mass concentration for circulating fluidized bed boiler based on BP neural network
Auto combustion adjustment in boiler based on coal quality correction using air to coal radio

Related Author

陈剑锋
王震皓
LAI Changsheng
BAI Jianyun
YIN Jiang
ZOU Yangjun
CHENG Leming
XU Linjie

Related Institution

Huaneng Fuzhou Power Plant
Huaneng Fuzhou Power Plant Fujian Changle
Fujian Changle
Automation Department of Shanxi University
Huadian Electric Power Research Institute
0