您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT
更新时间:2025-09-28
    • OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT

    • Thermal Power Generation   Vol. 40, Issue 9, Pages: 62-64(2011)
    • CLC: TK227
    • Published:2011

    移动端阅览

  • HE Yingguang Datang Honghe Power Generation Co Ltd. OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT[J]. Thermal power generation, 2011, 40(9): 62-64. DOI:

  •  
  •  

0

Views

186

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
CONTROL OF CFB BOILER IN LOAD REJECTION TEST OF 300 MW UNIT
RETROFIT FOR AIR STAGED BURNING AND OPERATION TEST OF BOILER NO.3 IN WULASHAN POWER PLANT
AUTOMATIC CONTROL SYSTEM OF SCR FLUE GAS DENITRIFICATION AND ITS APPLICATION IN SANHE POWER PLANT
ANALYSIS OF DESIGN FOR SWIRLING PULVERIZED COAL BURNERS WITH LOW NOx EMISSION

Related Author

MEI Sheng1
HAO Defeng2 1.Ma'anshan Wannengda Power Generation Co Ltd
LIU Jixiang1
ZHENG Zonghui1
GUO Tao1
DONG Zhiqian2 1.Gansu Electric Power Science Research Institute
ZUO Shuang-ji(Nei Monggol Industrial University
LI Feng

Related Institution

Ma'anshan Wannengda Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Gansu Electric Power Research Institute
Jingmei Fenghuangling Power Plant
Inner Mongolia University of Technology
0