您当前的位置:
首页 >
文章列表页 >
METHOD FOR REDUCING SLUDGE DEPOSITION IN STEAM GENERATION OF NUCLEAR POWER PLANT
更新时间:2025-09-28
    • METHOD FOR REDUCING SLUDGE DEPOSITION IN STEAM GENERATION OF NUCLEAR POWER PLANT

    • Thermal Power Generation   Vol. 40, Issue 11, Pages: 68-70(2011)
    • CLC: TL353.13;TM623
    • Published:2011

    移动端阅览

  • LIN Genxian, XUE Fei, LU Jundong, et al. METHOD FOR REDUCING SLUDGE DEPOSITION IN STEAM GENERATION OF NUCLEAR POWER PLANT[J]. Thermal power generation, 2011, 40(11): 68-70. DOI:

  •  
  •  

0

Views

145

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS AND REMOVAL OF OVERLOAD TRIPPING FOR ROOTS BLOWER USED TO SCRUB THE RESIN IN CONDENSATE POLISHING TREATMENT SYSTEM
PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION
APPLICATION OF OCTADECYLAMINE METHOD IN SHUTDOWN CONSERVATION OF NEWLY CONSTRUCTED SUPERCRITICAL UNITS
AN APPROACH TO THE PROBLEM OF CATION RESIN TRANSFER IN RESIN SEPARATION COLUMN OF CONDENSATE POLISHING SYSTEM IN LUANHE POWER PLANT
STUDY ON THE INTERCRYSTALLINE CORROSION RESISTANT ABILITY OF Incoloy800H HEAT TRANSFER TUBES

Related Author

HUANG Xiao-chun Guodian Taizhou Power Generation Co.Ltd
ZHU Xing- bao The SUE Department of CNPEC
ZHOU Peng
WANG Bo
WEN Gong-qian
MO Zongbao11.Hebei Provincial Electric Power Research Institute
MA Shisong2
SANG Junzhen1

Related Institution

Guodian Taizhou Power Generation Co., Ltd
CGN Engineering Co., Ltd
Shenhua Hebei Guohua Cangdong Power Generation Co., Ltd
Hebei Electric Power Research Institute
North China Electric Power Research Institute (Xi'an) Co., Ltd
0