您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF WATER SUPPLYING AND FLUSHING MODE FOR BOILER OF ULTRA-SUPERCRITICAL 1000 MW UNIT
更新时间:2025-09-28
    • OPTIMIZATION OF WATER SUPPLYING AND FLUSHING MODE FOR BOILER OF ULTRA-SUPERCRITICAL 1000 MW UNIT

    • Thermal Power Generation   Vol. 40, Issue 10, Pages: 35-37(2011)
    • CLC: TK228
    • Published:2011

    移动端阅览

  • HUANG Yin, WU Zehua Huaneng Yuhuan Power Plant. OPTIMIZATION OF WATER SUPPLYING AND FLUSHING MODE FOR BOILER OF ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2011, 40(10): 35-37. DOI:

  •  
  •  

0

Views

160

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

BOILER FEATURES OF EXTRA-SUPERCRITICAL 1000 MW UNIT EQUIPED IN HUANENG YUHUAN POWER PLANT
INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
SEVERAL PROBLEMS EXISTING IN OPERATION OF SUPERCRITICAL AND ULTRA-SUPERCRITICAL BOILERS
STUDY ON THE CONTROL MODEL OF INTERMEDIARY POINT TEMPERATURE IN BOILER OF ULTRA-SUPERCRITICAL UNIT BASED ON DYNAMIC MECHANISM ANALYSIS
TECHNICAL FEATURES OF PIPE-BLOWING ON ULTRA-SUPERCRITICAL 660 MW UNIT IN JINGGUANGSHAN POWER PLANT

Related Author

WANG Xin-sheng Huaneng Yuhuan Power Plant
CHEN Jian-xian
TAO Lei Guodian Beilun Power Plant
WANG Meng-hao1
WANG Heng1
ZHENG Min-niu2
YANG Cong-xuan31.Shanghai Wangte Energy Science and Technology Co Ltd
FANG Yanjun1

Related Institution

Guodian Beilun Power Plant
Shanghai Wangte Energy Technology Co., Ltd
Guodian Jianbi Power Plant
Shanghai Power Generation Equipment Complete Design and Research Institute
Department of Automation, Wuhan University
0