ANALYSIS OF AND TEST STUDY ON SALT DEPOSITION IN STEAM TURBINE OF SUBCRITICAL 600 MW UNITS
更新时间:2025-09-28
    • ANALYSIS OF AND TEST STUDY ON SALT DEPOSITION IN STEAM TURBINE OF SUBCRITICAL 600 MW UNITS

    • Thermal Power Generation   Vol. 40, Issue 11, Pages: 46-51(2011)
    • CLC: TM621.8
    • Published:2011

    移动端阅览

  • WANG Yinggao, LI Yongli, XING Chengxia, et al. ANALYSIS OF AND TEST STUDY ON SALT DEPOSITION IN STEAM TURBINE OF SUBCRITICAL 600 MW UNITS[J]. Thermal power generation, 2011, 40(11): 46-51. DOI:

  •  
  •  

0

Views

197

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ALLOCATION AND CAPACITY SELECTION OF BYPASS SYSTEM FOR LOCALIZED 600MW UNITS
SUPERFICIAL VIEWS TO ENHANCING THE LEVEL OF DCS CONTROL FOR 2×600MW SUPERCRITICAL UNITS IN SHANWEI POWER PLANT
ANALYSIS ABOUT APPLICATION OF SUPERCRITICAL 600 MW EXTRACTION STEAM TURBINE FOR HEATING IN INDUSTRY
CAUSE ANALYSIS AND PREVENTIVE MEASURES OF OUTFIRE IN W-SHAPED FLAME BOILER FOR 600 MW UNIT
AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT

Related Author

KONG jian
LI Xujun
ZENG Hao
ZHU Bao-tian21.Fujian Provincial Hongshan Thermal Power Co Ltd
NING Zhe2
JIA Qin-lao1
LI Bing-zheng1
ZHOU Zi-minDatang Huayin Jinzhushan Thermal Power Generation Branch Company

Related Institution

Guodian Thermal Power Research Institute
Honghai Bay Power Generation Co., Ltd.
Xi'an Thermal Power Research Institute Co., Ltd
Fujian Hongshan Thermal Power Co., Ltd
0