COMBUSTION ADJUSTMENT AND ECONOMIC OPERATION OF BOILER EQUIPPED FOR 1 000 MW UNIT
|更新时间:2025-09-28
|
COMBUSTION ADJUSTMENT AND ECONOMIC OPERATION OF BOILER EQUIPPED FOR 1 000 MW UNIT
Thermal Power GenerationVol. 41, Issue 3, Pages: 51-54(2012)
作者机构:
神华国华绥中发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK227.1
Published:2012
稿件说明:
移动端阅览
NING Xianwu, LI Zhishan, LI Shumin, et al. COMBUSTION ADJUSTMENT AND ECONOMIC OPERATION OF BOILER EQUIPPED FOR 1 000 MW UNIT[J]. Thermal power generation, 2012, 41(3): 51-54.
DOI:
NING Xianwu, LI Zhishan, LI Shumin, et al. COMBUSTION ADJUSTMENT AND ECONOMIC OPERATION OF BOILER EQUIPPED FOR 1 000 MW UNIT[J]. Thermal power generation, 2012, 41(3): 51-54.DOI:
COMBUSTION ADJUSTMENT AND ECONOMIC OPERATION OF BOILER EQUIPPED FOR 1 000 MW UNIT