TEST STUDY ON OPERATION OPTIMIZATION ADJUSTMENT OF BOILERS ALLOCATING VORTEX BURNERS ON THE FRONT WALL
更新时间:2025-09-28
    • TEST STUDY ON OPERATION OPTIMIZATION ADJUSTMENT OF BOILERS ALLOCATING VORTEX BURNERS ON THE FRONT WALL

    • Thermal Power Generation   Vol. 41, Issue 3, Pages: 58-61(2012)
    • CLC: TK223.23
    • Published:2012

    移动端阅览

  • CHEN Binghua1, LI Yujun1, WANG Zhiwei2 1.Huaneng Rizhao Power Plant. TEST STUDY ON OPERATION OPTIMIZATION ADJUSTMENT OF BOILERS ALLOCATING VORTEX BURNERS ON THE FRONT WALL[J]. Thermal power generation, 2012, 41(3): 58-61. DOI:

  •  
  •  

0

Views

119

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST STUDY ON START-UP AND SHUTDOWN OF COAL PULVERIZER WITHOUT INJECTIN FUEL OIL IN NORMAL OPERATION OF BOILERS IN SHAJIAO B POWER PLANT
STUDY ON PARAMETERS' CONTROL IN OPERATION OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission
Desired dynamic equation control based on maximum-sensitivity-constraint and its application in thermal power units
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF

Related Author

ZHANG Xiao-qing
KUANG Zhen-ping Shajiao B Power Plant
YANG Lei1
LI Qianyu2
WEN Zhiqiang11.North China Electric Power Science Research Institute Co Ltd
LIANG Ligang1
MENG Yong1
WU Shenglai1 Xi'an Thermal Power Research Institute Co.Ltd.

Related Institution

Shajiao B Power Plant
North China Electric Power Research Institute Co., Ltd
Beijing Jingneng International Energy Co., Ltd
中国电力国际发展有限公司
郑州大学电气与信息工程学院
0