您当前的位置:
首页 >
文章列表页 >
FCB TEST OF 330 MW UNIT IN INDRAMAYA POWER PLANT OF INDONESIA
更新时间:2025-09-28
    • FCB TEST OF 330 MW UNIT IN INDRAMAYA POWER PLANT OF INDONESIA

    • Thermal Power Generation   Vol. 41, Issue 3, Pages: 74-77(2012)
    • CLC: TM621
    • Published:2012

    移动端阅览

  • AN Xin1, LIU Guobi1, ZHANG Yafu1, et al. FCB TEST OF 330 MW UNIT IN INDRAMAYA POWER PLANT OF INDONESIA[J]. Thermal power generation, 2012, 41(3): 74-77. DOI:

  •  
  •  

0

Views

240

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
Multivariable feedback linearization control for gas storage chamber in compressed air energy storage system
Fuel fast cutting plan for thermal power unit during FCB process
Research on control system of voltage stabilizer pressure and liquid level in nuclear power station
APPLICATION OF APS ONTO GAS-STEAM COMBINED CYCLE UNITS

Related Author

WANG Haitao Xi'an Thermal Power Research Institute Co.
JIANG Ping
ZHAO Zhenjia
CHANG Ranran
SUN Lingfang
LANG Kun
REN He
WU Wanqiang

Related Institution

Rockwell Automation Laboratory, Hebei University
College of Electronic Information Engineering, Hebei University
School of Automation Engineering,Northeast Dianli University
School of Electric Power, South China University of Technology
Guangdong Province Key Laboratory of Efficient and Clean Energy Utilization
0