BOILER SHUT-DOWN CONSERVATION USING “AMMONIA SPIRIT/HYDRAZINE PASSIVATION DRYING OUT+VACUUM DRYING” METHOD FOR SUPERCRITICAL UNITS
|更新时间:2025-09-28
|
BOILER SHUT-DOWN CONSERVATION USING “AMMONIA SPIRIT/HYDRAZINE PASSIVATION DRYING OUT+VACUUM DRYING” METHOD FOR SUPERCRITICAL UNITS
Thermal Power GenerationVol. 41, Issue 4, Pages: 75-77(2012)
作者机构:
大唐淮南洛河发电厂
作者简介:
基金信息:
DOI:
CLC:TM621.2
Published:2012
稿件说明:
移动端阅览
WANG Yongcheng, WANG Dengxiang Datang Huainan Luohe Power Plant. BOILER SHUT-DOWN CONSERVATION USING “AMMONIA SPIRIT/HYDRAZINE PASSIVATION DRYING OUT+VACUUM DRYING” METHOD FOR SUPERCRITICAL UNITS[J]. Thermal power generation, 2012, 41(4): 75-77.
DOI:
WANG Yongcheng, WANG Dengxiang Datang Huainan Luohe Power Plant. BOILER SHUT-DOWN CONSERVATION USING “AMMONIA SPIRIT/HYDRAZINE PASSIVATION DRYING OUT+VACUUM DRYING” METHOD FOR SUPERCRITICAL UNITS[J]. Thermal power generation, 2012, 41(4): 75-77.DOI:
BOILER SHUT-DOWN CONSERVATION USING “AMMONIA SPIRIT/HYDRAZINE PASSIVATION DRYING OUT+VACUUM DRYING” METHOD FOR SUPERCRITICAL UNITS
摘要
某超临界机组采用"热炉放水余热烘干"或"成膜胺"停炉保护方法不能有效控制锅炉停用腐蚀
对此提出了"氨水、联氨钝化烘干+真空干燥"的停炉保护方法。实际应用结果表明
该方法在冷态冲洗的第1个小时
启动分离器处铁的含量分别为125、310μg/L;在整个冷态、热态冲洗过程中
同时间段的水质均优于热炉放水余热烘干方法
冲洗时间也较热炉放水余热烘干方法减少一半
节约了大量的除盐水及燃料。另外
在机组起动前对锅炉部分联箱进行了探测
未发现积水和二次浮锈
防腐效果明显。
Abstract
"The drying out using residual heat of blow-off water from hot furnace" or the boiler shut-down conservation method using "filming amine"
all can't effectively control corrosion during the time of boiler shut-down
for this
a boiler shutdown conservation method using "ammonia spirit/hydrazine passivation drying out + vacuum drying" has been put forward.Results of practical application show that the water quality in same time section of using this conservation method is superior to that of the origenal method
during the first hour of cold-state flushing
the iron content at the time of starting separator is 125 μg/L and 310 μg/L respectively
the flushing time has reduced 50% from that of the origenal method
a large amount of desalted water and fuel has been saved.In addition
a partial header of the boiler had been detected before start-up of the unit
the water accumulation and secondary floating corrosive matters haven't been discovered
boasting remarkable effectiveness of corrosion prevention.