OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
|更新时间:2025-09-28
|
OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
Thermal Power GenerationVol. 41, Issue 11, Pages: 59-63(2012)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.6
Published:2012
稿件说明:
移动端阅览
WANG Haitao Xi'an Thermal Power Research Institute Co.. OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION[J]. Thermal power generation, 2012, 41(11): 59-63.
DOI:
WANG Haitao Xi'an Thermal Power Research Institute Co.. OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION[J]. Thermal power generation, 2012, 41(11): 59-63.DOI:
OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
Several fast cut back(FCB) tests of the 330 MW unit in Indonesia INDRAMAYU Power Plant were presented.Based on analyzing such problems as wrong action of bypass protection system
speed overshoot of the turbines
and sharp decrease of the main steam temperature
optimization of parameters of temperature regulation control loop in high pressure bypass and generator tripping control logic of steam turbine interlocking during FCB was performed.Test results showed that
the maximum differences of temperature main and reheat steam drop for were 25 ℃ and 23 ℃
respectively.After the improvement
the regulation quality was significantly enhanced.