您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
更新时间:2025-09-28
    • OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION

    • Thermal Power Generation   Vol. 41, Issue 11, Pages: 59-63(2012)
    • CLC: TM621.6
    • Published:2012

    移动端阅览

  • WANG Haitao Xi'an Thermal Power Research Institute Co.. OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION[J]. Thermal power generation, 2012, 41(11): 59-63. DOI:

  •  
  •  

0

Views

219

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

INSTALLATION AND TYPE-SELECTION OF THE BY-PASS SYSTEM FOR 600MW SUPERCRITICAL UNIT AT QINBEI POWER PLANT
OPERATION BEHAVIOR OF STARTUP SYSTEM FOR ONCETHROUGH BOILERS WITH BYPASS SYSTEM OF STEAM TURBINE AND SIMULATION THEREOF
DIAGNOSTIC ANALYSIS OF UNSTABLE VIBRATION CONCERNING MEDIUMPRESSURE ROTOR OF 330 MW STEAM TURBINES
ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD
FCB TEST OF 330 MW UNIT IN INDRAMAYA POWER PLANT OF INDONESIA

Related Author

Huo Dongfang
多保林
侯书海
WANG Yanbo
KOU shengli
LI Bin
AN Xin1
LIU Guobi1

Related Institution

Huaneng Qinbei Power Plant Henan Jiyuan
Nanhai Power Plant No.1
Huaneng Weihai Power Plant
Xi'an Thermal Power Research Institute Co.,Ltd.
0