您当前的位置:
首页 >
文章列表页 >
SLAGGING ON 300 MW UNIT BOILERS:REASON ANALYSIS AND COUNTERMEASURES
更新时间:2025-09-28
    • SLAGGING ON 300 MW UNIT BOILERS:REASON ANALYSIS AND COUNTERMEASURES

    • Thermal Power Generation   Vol. 41, Issue 9, Pages: 120-121(2012)
    • CLC: TK227
    • Published:2012

    移动端阅览

  • ZOU Xianhong1, LUO Qing1, CHEN Guangyuan2, et al. SLAGGING ON 300 MW UNIT BOILERS:REASON ANALYSIS AND COUNTERMEASURES[J]. Thermal power generation, 2012, 41(9): 120-121. DOI:

  •  
  •  

0

Views

98

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT
APPLICATION OF DUAL-SEALING TECHNOLOGY IN RETROFITTING SEAL OF ROTARY AIR PREHEA TERS
CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF
CAUSE ANALYSIS FOR SOMEWHAT LOW INDICATING VALUE OF THE FLAME DETECTOR OR MISJUDGEMENT OF THE VALUE AND RESOLVING MEASURES THEREOF
RETROFIT FOR AIR STAGED BURNING AND OPERATION TEST OF BOILER NO.3 IN WULASHAN POWER PLANT

Related Author

LI xian-zhong1
Wang Guo-kun2
XUE Zhao-wei21.Department of Power Engineering
LIU Gui-feng
SUN Jian-bo
AN Xue-zhong
XIE Wen-jun
YIE Feng

Related Institution

Zhengzhou Electric Power College Power Engineering Department
China Resources Power Dengfeng Co., Ltd
Huaibei Guoan Electric Power Co., Ltd
Beijing Huanengda Electric Power Technology Application Co., Ltd.
0