您当前的位置:
首页 >
文章列表页 >
INFLUENCE OF LOAD VARIATION CONCERNING TWO-STAGE COAL-WATER SLURRY GASIFIER UPON PERFORMANCE OF THE IGCC SYSTEM
更新时间:2025-09-28
    • INFLUENCE OF LOAD VARIATION CONCERNING TWO-STAGE COAL-WATER SLURRY GASIFIER UPON PERFORMANCE OF THE IGCC SYSTEM

    • Thermal Power Generation   Vol. 41, Issue 6, Pages: 14-18(2012)
    • CLC: TK473
    • Published:2012

    移动端阅览

  • LIU Yaoxin1, WU Shaohua1, LI Zhenzhong2, et al. INFLUENCE OF LOAD VARIATION CONCERNING TWO-STAGE COAL-WATER SLURRY GASIFIER UPON PERFORMANCE OF THE IGCC SYSTEM[J]. Thermal power generation, 2012, 41(6): 14-18. DOI:

  •  
  •  

0

Views

129

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS AND IMPROVEMENT MEASURES FOR PRESSURE REDUCTION OF LUBRICANT OIL DURING STARTUP OF 300MW UNITS

Related Author

LUO Juan
HU Niansu
QI Haitao
WANG Zhijun
WANG Chenyu
SU Tongchun
LIU Hong
HU Song

Related Institution

Wuhan University
Zhangze Power Plant
Zhangze Power Plant Shanxi Changzhi
Harbin Power Station Engineering Co., Ltd
0