RESEARCH AND APPLICATION OF PRE-BALANCING OF SHAFT SYSTEM FOR TURBO-GENERATOR UNIT
|更新时间:2025-09-28
|
RESEARCH AND APPLICATION OF PRE-BALANCING OF SHAFT SYSTEM FOR TURBO-GENERATOR UNIT
Thermal Power GenerationVol. 41, Issue 7, Pages: 92-95(2012)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM311
Published:2012
稿件说明:
移动端阅览
HE Guoan, ZHANG Xueyan, WANG Yanbo Xi'an Thermal Power Research Institute Co.Ltd.. RESEARCH AND APPLICATION OF PRE-BALANCING OF SHAFT SYSTEM FOR TURBO-GENERATOR UNIT[J]. Thermal power generation, 2012, 41(7): 92-95.
DOI:
HE Guoan, ZHANG Xueyan, WANG Yanbo Xi'an Thermal Power Research Institute Co.Ltd.. RESEARCH AND APPLICATION OF PRE-BALANCING OF SHAFT SYSTEM FOR TURBO-GENERATOR UNIT[J]. Thermal power generation, 2012, 41(7): 92-95.DOI:
RESEARCH AND APPLICATION OF PRE-BALANCING OF SHAFT SYSTEM FOR TURBO-GENERATOR UNIT
In order to improve the efficiency of dynamic balance and reduce the number of startup
pre-balancing method of shaft system for turbo-generator unit was proposed.Based on the history and characteristics of the unit vibration
shis method pre-evaluated the influence of factors such as maintenance and installation
on the vibration condition of shaft system
and pre-weighed the shaft system before the unit starting.Validation of the pre-balancing method of shaft system was done on a 600 MW unit.Results show that
this method is applicable to the dynamic balance of vibration with critical speed
to the balance compensation of bended rotor
and to the elimination of unbalance mass caused by fracture repair of turbine blade or shroud ring.