DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER
|更新时间:2025-09-28
|
DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER
Thermal Power GenerationVol. 41, Issue 8, Pages: 56-58(2012)
作者机构:
1. 河南电力试验研究院
2. 鹤壁丰鹤发电有限责任公司
作者简介:
基金信息:
DOI:
CLC:TK223.26
Published:2012
稿件说明:
移动端阅览
GUO Yujie1, REN Guangyin2, LIU Zhanhui1, et al. DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER[J]. Thermal power generation, 2012, 41(8): 56-58.
DOI:
GUO Yujie1, REN Guangyin2, LIU Zhanhui1, et al. DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER[J]. Thermal power generation, 2012, 41(8): 56-58.DOI:
DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER
摘要
某电厂超临界600MW机组锅炉的双级动叶片调节轴流一次风机运行2年后出现了不规律间歇性振动
水平振动达11mm/s以上。通过测试
认为风机执行机构严重磨损造成两级动叶开度不同步是引起振动的主要原因。对此
更换一、二级执行机构的铜套后振动消除。
Abstract
After about two years in operation
non-regular intermittent vibration had occurred on axialflow primary air fan with double-stage moving blades regulation equipped for boiler of supercritical 600 MW unit in one power plant.Through test
it is believed that the main cause resulting in vibration is serious abrasion on the actuator of said fan.For this
the copper bushes of first-and secondary-stage actuators have been replaced
and the vibration being eliminated.The parts of fan's actuator are easily to be abraded and failed
resulting in non-synchronizing fault in opening degree of the double-stage moving blades