ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT
|更新时间:2025-09-28
|
ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT
Thermal Power GenerationVol. 41, Issue 7, Pages: 89-91(2012)
作者机构:
1. 湖北省电力公司电力试验研究院
2. 东南大学火电机组振动国家工程研究中心
作者简介:
基金信息:
DOI:
CLC:TM311
Published:2012
稿件说明:
移动端阅览
LU Shuanglong1, YANG Jiangang2, WANG Shushen1, et al. ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT[J]. Thermal power generation, 2012, 41(7): 89-91.
DOI:
LU Shuanglong1, YANG Jiangang2, WANG Shushen1, et al. ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT[J]. Thermal power generation, 2012, 41(7): 89-91.DOI:
ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT
ANALYSIS OF VIBRATION PROBLEM FOR HOME - MADE 600 MW SUPERCRITICAL TURBO - GENERATOR SET AND TREATMENT THEREOF
VIBRATION DISPOSAL OF 2×600 MW AIR-COOLED UNITS
FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF
ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET