RESEARCH AND APPLICATIONS OF REAL-TIME PERFORMANCE CALCULATION FOR GARBAGE POWER PLANT
|更新时间:2025-09-28
|
RESEARCH AND APPLICATIONS OF REAL-TIME PERFORMANCE CALCULATION FOR GARBAGE POWER PLANT
Thermal Power GenerationVol. 41, Issue 9, Pages: 24-28(2012)
作者机构:
1. 西安热工研究院有限公司
2. 深圳能源集团股份有限公司
作者简介:
基金信息:
DOI:
CLC:TM619
Published:2012
稿件说明:
移动端阅览
WANG Zhiwei1, FAN Qi1, ZHANG Hao1, et al. RESEARCH AND APPLICATIONS OF REAL-TIME PERFORMANCE CALCULATION FOR GARBAGE POWER PLANT[J]. Thermal power generation, 2012, 41(9): 24-28.
DOI:
WANG Zhiwei1, FAN Qi1, ZHANG Hao1, et al. RESEARCH AND APPLICATIONS OF REAL-TIME PERFORMANCE CALCULATION FOR GARBAGE POWER PLANT[J]. Thermal power generation, 2012, 41(9): 24-28.DOI:
RESEARCH AND APPLICATIONS OF REAL-TIME PERFORMANCE CALCULATION FOR GARBAGE POWER PLANT
Calculation methods of performance index on plant-level
unit-level and device-level in a garbage power plant were investigated.For real-time data
the main steam flow distribution
waste thermal value calculation
and the abnormal data processing were introduced.Moreover
real-time calculation methods of the performance of such equipments as boiler
turbine
condenser and auxiliaries for the garbage power plant were given.The feasibility and accuracy of this method was verified by real-time performance calculation of the 12 MW unit and 24 MW unit.