您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS ON LOW EFFICIENCY OF DESULPHURIZATION SYSTEM FOR NO.4 UNIT IN ZHANJIANG POWER PLANT
更新时间:2025-09-28
    • CAUSE ANALYSIS ON LOW EFFICIENCY OF DESULPHURIZATION SYSTEM FOR NO.4 UNIT IN ZHANJIANG POWER PLANT

    • Thermal Power Generation   Vol. 41, Issue 9, Pages: 91-93(2012)
    • CLC: X773
    • Published:2012

    移动端阅览

  • HUANG Jiye Zhanjiang Electric Power Co.. CAUSE ANALYSIS ON LOW EFFICIENCY OF DESULPHURIZATION SYSTEM FOR NO.4 UNIT IN ZHANJIANG POWER PLANT[J]. Thermal power generation, 2012, 41(9): 91-93. DOI:

  •  
  •  

0

Views

70

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CALCULATION OF WASTEWATER AMOUNT FOR FGD SYSTEM AND ITS ZERO DISCHARGE TECHNOLOGY
ANALYSIS OF MIXEDLY BURNING PETROLEUM COKE TECHNOLOGY IN CFB BOILER
CAUSE ANALYSIS OF IMPELLER FRACTURE FOR SLURRY-RECIRCULATING PUMPS IN SHANWEI POWER PLANT
PROBLEM ANALYSIS AND CONTROL OPTIMIZATION OF MAIN AUTOMATIC PROTECTION FACILITIES IN THE FGD SYSTEM
INFLUENCE OF ADDING DESULPHURIZOR UPON THE HEAT BALANCE IN A CFB BOILER

Related Author

TAN Wen-yi21.Zhejiang Electric Power Testing & Research Institute
ZHOU Chen1
DNEG YushengMaoming Petroleum-Chemical Power Plant
HUANG Yi-huiRed Bay Power Generation Co Ltd
JIANG Jiefu21.Hunan Provincial Electric Power Testing & Research Institute
WANG Bochun1
LUO Jie1
CHENG Hui2 1.State-level Key Laboratory of Clean Energy Utilization

Related Institution

Department of Environmental Engineering, Nanjing University of Engineering
Zhejiang Electric Power Test and Research Institute
Maoming Petrochemical Power Plant
Honghai Bay Power Generation Co., Ltd
Zhuzhou Huayin Thermal Power Generation Co., Ltd
0