ECONOMIC ANALYSIS ON SINGLE ROW CONFIGURATION OF FORCED, INDUCED,AND PRIMARY AIR FANS FOR A 600 MW BOIELR
更新时间:2025-09-28
    • ECONOMIC ANALYSIS ON SINGLE ROW CONFIGURATION OF FORCED, INDUCED,AND PRIMARY AIR FANS FOR A 600 MW BOIELR

    • Thermal Power Generation   Vol. 41, Issue 8, Pages: 6-8(2012)
    • CLC: TK223.26
    • Published:2012

    移动端阅览

  • LI Shuangjiang, LU Ming, JIA Shaoguang Hebei Electric Power Design and Research Institute. ECONOMIC ANALYSIS ON SINGLE ROW CONFIGURATION OF FORCED, INDUCED,AND PRIMARY AIR FANS FOR A 600 MW BOIELR[J]. Thermal power generation, 2012, 41(8): 6-8. DOI:

  •  
  •  

0

Views

185

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPERATIONAL CHARACTORS OF BOILERS EQUIPPED FOR ULTRA-SUPERCRITICAL 660 MW UNIT AFTER COMBINING THE BOOSTER AIR FAN IN DESULPHURIZATION SYSTEM AND THE INDUCED DRAFT FAN INTO ONE
Flue gas recirculation scheme for double-reheat boilers
ELIMINATION OF GAS AND AIR DUCTS' VIBRATION AS WELL AS VIBRATION DUE TO FANS' FOULING FOR BOILERS OF 100 MW UNIT
ANALYSIS AND STUDY ON SLAGGING ALLEVIATION IN BOILERS
AN APPROACH TO PROBLEM OF SCRAMBLING FOR AIR OF AXIAL I. D. FANS WITH STATIONARY BLADE ADJUSTMENT

Related Author

CHEN Xing
ZHOU Liguo Datang Xinyang Hua'yu Power Generation Co Ltd
FAN Qingwei
CHAI Qi
MAO Yijun
LIU Nianping
SU Yongning
李鹏翔

Related Institution

Datang Xinyang Huayu Power Generation Co., Ltd
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Anyuan Power Generation Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
Shanxi Niangziguan Power Plant
0