您当前的位置:
首页 >
文章列表页 >
UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT
更新时间:2025-09-28
    • UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT

    • Thermal Power Generation   Vol. 41, Issue 12, Pages: 109-110(2012)
    • CLC: TH38
    • Published:2012

    移动端阅览

  • LU Hongying1, LU Jianlin2 1.Power Engineering Department. UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT[J]. Thermal power generation, 2012, 41(12): 109-110. DOI:

  •  
  •  

0

Views

38

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A preliminary study of turbine in solar chimney power generation system associated with seawater desalination
A TENTATIVE IDEA FOR ENHANCING THE HIGI-PRESSURE HEATER'S RELIABILITY OF LARGE-SCALE UNITS
APPLICATION AND IMPROVEMENT OF KSB FEED-WATER PUMPS IN SHOUYANGSHAN POWER PLANT
ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT

Related Author

ZHANG Lei
LI Kang
WANG Songling
ZUO Lu
TANG Zhiyi
LIU Yucheng
YUAN Yue
周兰欣

Related Institution

Key Laboratory of Condition Monitoring and Control for Power Plant Equipment, Ministry of Education, North China Electric Power University
College of Energy and Electrical Engineering, Hohai University
Jiaozuo Power Plant
Rizhao Power Plant
0