UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT
|更新时间:2025-09-28
|
UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT
Thermal Power GenerationVol. 41, Issue 12, Pages: 109-110(2012)
作者机构:
1. 重庆电力高等专科学校动力工程系
2. 国网新源公司重庆发电厂
作者简介:
基金信息:
DOI:
CLC:TH38
Published:2012
稿件说明:
移动端阅览
LU Hongying1, LU Jianlin2 1.Power Engineering Department. UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT[J]. Thermal power generation, 2012, 41(12): 109-110.
DOI:
LU Hongying1, LU Jianlin2 1.Power Engineering Department. UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT[J]. Thermal power generation, 2012, 41(12): 109-110.DOI:
UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT
摘要
基于DG185-385型给水泵的比转速
采用二元设计、三元校核的方法对DG185-385型芯包进行改造
并通过改造前、后的给水泵性能试验验证改造效果。结果表明
给水泵改造后其流量、扬程和效率均有较大提高
可满足单机在150MW负荷以下2台给水泵高效轮换运行。
Abstract
Based on the specific speed of DG185-385 feed water pump
upgrading of the pump was conducted by using dualistic designing and ternary checking method.The optimization effect was verified through performance test of the pump before and after the retrofitting.Results showed that
after improvement
the flow
delivery lift and efficiency of the pump was improved a lot.Two water pumps run alternately and efficiently to insure safe operation of single generator under load of 150 MW can be realized.