ABNORMAL VIBRATION ON A 300 MW GENERATING UNIT WITH STEAM TURBINE:CAUSE ANALYSIS AND DISPOSAL
|更新时间:2025-09-28
|
ABNORMAL VIBRATION ON A 300 MW GENERATING UNIT WITH STEAM TURBINE:CAUSE ANALYSIS AND DISPOSAL
Thermal Power GenerationVol. 41, Issue 12, Pages: 96-97(2012)
作者机构:
1. 河北省电力研究院
2. 华北电力大学能源动力与机械工程学院
作者简介:
基金信息:
DOI:
CLC:TK268
Published:2012
稿件说明:
移动端阅览
GAO Xiang1, LU Shengyang1, GAO Xin1, et al. ABNORMAL VIBRATION ON A 300 MW GENERATING UNIT WITH STEAM TURBINE:CAUSE ANALYSIS AND DISPOSAL[J]. Thermal power generation, 2012, 41(12): 96-97.
DOI:
GAO Xiang1, LU Shengyang1, GAO Xin1, et al. ABNORMAL VIBRATION ON A 300 MW GENERATING UNIT WITH STEAM TURBINE:CAUSE ANALYSIS AND DISPOSAL[J]. Thermal power generation, 2012, 41(12): 96-97.DOI:
ABNORMAL VIBRATION ON A 300 MW GENERATING UNIT WITH STEAM TURBINE:CAUSE ANALYSIS AND DISPOSAL
摘要
针对某300MW机组在降负荷时振动突然增大的原因进行了分析。结果表明
引起该故障的原因为调节阀的喷嘴开启顺序设计不合理。通过实施调节阀开启顺序优化
将原调节阀喷嘴开启顺序由1、4→5→6→2→3调整为1、6→5→4→2→3后
在不停机的状态下处理了振动故障
保证了机组的安全稳定运行。
Abstract
Shafting vibration suddenly increased on a 300 MW unit during the load descending.Unreasonable opening sequence of the control valve was considered as the main reason after analysis.Thus
the original opening sequence 1
4→5→6→2→3 was adjusted and replaced by 1
6→5→4→2→3.The optimization handled the vibration without shutdown
COMPREHENSIVE WAY FOR TACKLING INDUCED DRAFT FAN VIBRATION OF 300MW UNITS IN SHIMEN POWER PLANT
FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
ANALYSIS OF VIBRATION PROBLEM DURING GOVENOR VALVE SWITCHING IN THE CONTROL MODE OF ONE 600 MW STEAM TURBINE UNIT AND OPTIMIZATION OF ITS STEAM DISTRIBUTION
VIBRATION DISPOSAL OF 2×600 MW AIR-COOLED UNITS
PHASE-DIFFERENCE DIAGNOSING METHOD FOR SHAFT VIBRATION FAULT OF TURBO-GENERATOR SET