FF and Profibus bus technology based water network control system for Laizhou Power Plant of China Huadian Corporation
|更新时间:2025-09-28
|
FF and Profibus bus technology based water network control system for Laizhou Power Plant of China Huadian Corporation
Thermal Power GenerationVol. 42, Issue 1, Pages: 91-93(2013)
作者机构:
1. 西安热工研究院有限公司
2. 渭河发电有限公司
作者简介:
基金信息:
DOI:
CLC:TM621.6
Published:2013
稿件说明:
移动端阅览
TIAN Shuang1, HAO Wei2, SONG Meiyan1, et al. FF and Profibus bus technology based water network control system for Laizhou Power Plant of China Huadian Corporation[J]. Thermal power generation, 2013, 42(1): 91-93.
DOI:
TIAN Shuang1, HAO Wei2, SONG Meiyan1, et al. FF and Profibus bus technology based water network control system for Laizhou Power Plant of China Huadian Corporation[J]. Thermal power generation, 2013, 42(1): 91-93.DOI:
FF and Profibus bus technology based water network control system for Laizhou Power Plant of China Huadian Corporation
Combining with the water network control system in Huadian Laizhou Power Plant
this paper summarizes the key points of design for applying FF and Profibus-DP field bus to water network control in thermal power plant.By taking the Ovation DCS from Emerson Process Management of America as the platform
this system reasonably configures the two field bus protocols
FF and Profibus-DP
so the control of water network can be realized.Meanwhile
to solve the problems that occur during the control system debugging
such as frequent signal interference
parameter setting errors for master and slave station