您当前的位置:
首页 >
文章列表页 >
Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission
更新时间:2025-09-28
    • Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission

    • Thermal Power Generation   Vol. 42, Issue 1, Pages: 63-66(2013)
    • CLC: TK227
    • Published:2013

    移动端阅览

  • LIANG Ligang1, MENG Yong1, WU Shenglai1 Xi'an Thermal Power Research Institute Co.Ltd.. Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission[J]. Thermal power generation, 2013, 42(1): 63-66. DOI:

  •  
  •  

0

Views

110

下载量

18

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST STUDY ON COMBUSTION ADJUSTMENT OF BOILER FOR SUPERCRITICAL 600MW UNIT IN YANGZHOU POWER PLANT
TEST STUDY ON START-UP AND SHUTDOWN OF COAL PULVERIZER WITHOUT INJECTIN FUEL OIL IN NORMAL OPERATION OF BOILERS IN SHAJIAO B POWER PLANT
PREDICTION OF NOx CONCENTRATION EMITTED FROM COAL FIRED BOILERS WITH CORNER TANGENTIAL FIRING
TEST STUDY ON OPERATION OPTIMIZATION ADJUSTMENT OF BOILERS ALLOCATING VORTEX BURNERS ON THE FRONT WALL
TEMPERATURE DEVIATION BETWEEN MAIN AND REHEAT STEAM AND TUBE-WALL OVERTEMPERATURE FOR TANGENTIALLY-FIRED BOILER: ANALYSIS AND TREATMENT

Related Author

JIANG Jian-gang1
LI Yong-ling1
ZHANG Chun-fa21.Department of Power
ZHANG Xiao-qing
KUANG Zhen-ping Shajiao B Power Plant
LI Ming
OU Zongxian Yantai Longyuan Electric Power Technology Co Ltd
CHEN Binghua1

Related Institution

Power Department of Baoding Electric Power Vocational and Technical College
Department of Power Engineering, North China Electric Power University
Shajiao B Power Plant
Yantai Longyuan Electric Power Technology Co., Ltd
Huaneng Rizhao Power Plant
0