Feasibility of closed circulating water waste heat utilization in 600MW supercritical unit
更新时间:2025-09-28
    • Feasibility of closed circulating water waste heat utilization in 600MW supercritical unit

    • Thermal Power Generation   Vol. 42, Issue 3, Pages: 5-7(2013)
    • CLC: TK115;TK267
    • Published:2013

    移动端阅览

  • LUO Haihua, WANG Baoyu, ZHAO Yuzhu, et al. Feasibility of closed circulating water waste heat utilization in 600MW supercritical unit[J]. Thermal power generation, 2013, 42(3): 5-7. DOI:

  •  
  •  

0

Views

164

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

AN APPROACH TO START-UP MODE WITH CIRCULATORY PUMP FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600MW UNIT
ANALYSIS AND OPTIMIZATION OF COORDINATED CONTROL SYSTEM FOR SUPERCRITICAL 600 MW UNIT
Optimization on coordinated control system of supercritical unit in Huaneng Shanghai Shidongkou Second Power Plant
Automatic control logic optimization for feed-water in start-up period of a 600MW unit
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units

Related Author

LIU Ming-yuan
LIN Feng
WU Quan
LI JingGuodian Dalian Zhuanghe Power Generation Co Ltd
SONG Haihua1
WANG Bochun1
ZHOU Jun2 1.Testing and Research Institute under Hunan Provincial Electric Power Company
ZHAO Zhidan

Related Institution

Guodian Dalian Zhuanghe Power Generation Co., Ltd
Hunan Electric Power Company Experimental Research Institute
Huadian Changsha Sofa Electric Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Shanghai Shidongkou Second Power Plant
0