您当前的位置:
首页 >
文章列表页 >
Discussion on startup technology without alternate steam in a 300 MW thermal power unit
更新时间:2025-09-28
    • Discussion on startup technology without alternate steam in a 300 MW thermal power unit

    • Thermal Power Generation   Vol. 42, Issue 4, Pages: 77-79(2013)
    • CLC: TM621
    • Published:2013

    移动端阅览

  • LI Ruxiang1, LIU Dingping2 1.Shaoguan Power Plant. Discussion on startup technology without alternate steam in a 300 MW thermal power unit[J]. Thermal power generation, 2013, 42(4): 77-79. DOI:

  •  
  •  

0

Views

74

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF TEMPERATUREREGULATING METHOD USING OSCILLATORY BURNERS FOR REHEATED STEAM OF 300 MW UNIT AND IMPROVEMENT RECOMMENDATIONS THEREOF
PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
DESIGN OF THE INTEGRATED WATERANDSTEAM MONITORING SYSTEM BASED ON VIRTUAL INSTRUMENTS
APPLICATION OF PLC IN ASH DISPOSAL CONTROL SYSTEM FOR POWER PLANTS
DEVELOPMENT OF ZL TYPE INTELLIGENT LEVEL INDICATOR

Related Author

XIAO Ping
LIU Tonghua
CHEN Shao min
LI Zhicheng
YANG Wansheng
PEI Feng
GE Xin
DING Feng

Related Institution

Chongqing Electric Power Company
Guang'an Power Generation Co., Ltd
Chongqing Electric Power College Chongqing
Wuhan University
0