PRIMARY FREQUENCY REGULATION BASED OPTIMIZATION FOR CONTROL SYSTEM OF M701F GAS-STEAM COMBINED CYCLE POWER UNIT
|更新时间:2025-09-28
|
PRIMARY FREQUENCY REGULATION BASED OPTIMIZATION FOR CONTROL SYSTEM OF M701F GAS-STEAM COMBINED CYCLE POWER UNIT
Thermal Power GenerationVol. 41, Issue 12, Pages: 61-64(2012)
作者机构:
深圳市广前电力有限公司
作者简介:
基金信息:
DOI:
CLC:TM611.31
Published:2012
稿件说明:
移动端阅览
WU Haibin Shenzhen Guangqian Electric Co.. PRIMARY FREQUENCY REGULATION BASED OPTIMIZATION FOR CONTROL SYSTEM OF M701F GAS-STEAM COMBINED CYCLE POWER UNIT[J]. Thermal power generation, 2012, 41(12): 61-64.
DOI:
WU Haibin Shenzhen Guangqian Electric Co.. PRIMARY FREQUENCY REGULATION BASED OPTIMIZATION FOR CONTROL SYSTEM OF M701F GAS-STEAM COMBINED CYCLE POWER UNIT[J]. Thermal power generation, 2012, 41(12): 61-64.DOI:
PRIMARY FREQUENCY REGULATION BASED OPTIMIZATION FOR CONTROL SYSTEM OF M701F GAS-STEAM COMBINED CYCLE POWER UNIT
The dynamic response characteristic of primary frequency regulation(PFR) for M701F gas-steam combined cycle unit can not reach the performance standards.Based on the reason analysis for this
some optimizations were carried out
such as selecting the speed control mode in main control system to improve the response speed of primary frequency regulation
narrowing the regulation dead band and increasing the regulation range in automatic load regulation(ALR) system.Results showed that
after optimization
the response time of PFR was between 1 s and 2 s when the frequency variation of power network exceeded the unit PFR dead band.Within 45 s
the actual PFR amount exceeded 70% of the theoretical frequency regulation.Therefore
the optimized PFR function totally satisfied the requirements of power dispatching on the PFR performance.