Load following control technology for large scale nuclear power plants
|更新时间:2025-09-28
|
Load following control technology for large scale nuclear power plants
Thermal Power GenerationVol. 42, Issue 4, Pages: 17-19(2013)
作者机构:
1. 广东电网公司电力科学研究院
2. 西安交通大学能动学院
作者简介:
基金信息:
DOI:
CLC:TM623
Published:2013
稿件说明:
移动端阅览
WU Yuzhong1, ZHAO Fuyu2 1.Electric Power Research Institute of Guangdong Power Grid Corporation. Load following control technology for large scale nuclear power plants[J]. Thermal power generation, 2013, 42(4): 17-19.
DOI:
WU Yuzhong1, ZHAO Fuyu2 1.Electric Power Research Institute of Guangdong Power Grid Corporation. Load following control technology for large scale nuclear power plants[J]. Thermal power generation, 2013, 42(4): 17-19.DOI:
Load following control technology for large scale nuclear power plants
摘要
在对国外主要核电机组负荷跟踪控制原理和运行模式进行研究的基础上
针对几种堆型的负荷跟踪运行控制特点
分析了机组参与调峰、调频的可行性以及存在问题
为国内核电机组参与调峰、调频提供技术依据。
Abstract
The control principle and operation mode of load following technology applied in abroad major nuclear power plants were investigated.Moreover
on the basis of control characteristics of load following operation in domestic building nuclear power stations with various reactor types
the feasibility of the unit participating in peak load regulating and frequency adjusting and the existing problems were analyzed
providing technical basis for the domestic nuclear power station taking part in peak load control and frequency control.