Analysis and optimization on run back control strategy for unit with CFB boiler
更新时间:2025-09-28
    • Analysis and optimization on run back control strategy for unit with CFB boiler

    • Thermal Power Generation   Vol. 42, Issue 2, Pages: 74-81(2013)
    • CLC: TK32
    • Published:2013

    移动端阅览

  • WANG Fei, HE Jinqi Northwest Power Construction Commissioning Institute. Analysis and optimization on run back control strategy for unit with CFB boiler[J]. Thermal power generation, 2013, 42(2): 74-81. DOI:

  •  
  •  

0

Views

152

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT
DESIGN AND TEST OF RB CONTROL FOR 300 MW UNITS
TEST STUDY ON COMBUSTION ADJUSTMENT OF ONE CFB BOILER FOR 300 MW UNIT
Reason analysis for fracture occurred in axial induced draft fan blade of a 600 MW unit
Operation performance of electrostatic precipitator in circulating fluidized bed boiler in wide load range

Related Author

PENG Yi
QU Guang-hao
LIU Shu-jie
ZHONG Li1
XU Zhengquan1
CAO Xingwei2
ZHANG Li2
QIU Zhong2

Related Institution

Guang'an Power Plant Sichuan Guang'an
Huaneng Dezhou Power Plant
Huaneng Clean Energy Technology Research Institute Co., Ltd
Xinjiang Midong Thermal Power Plant
Xi’an TPRI Energy Conservation Technology Co., Ltd.
0