Analysis and optimization on run back control strategy for unit with CFB boiler
|更新时间:2025-09-28
|
Analysis and optimization on run back control strategy for unit with CFB boiler
Thermal Power GenerationVol. 42, Issue 2, Pages: 74-81(2013)
作者机构:
西北电力建设调试研究所
作者简介:
基金信息:
DOI:
CLC:TK32
Published:2013
稿件说明:
移动端阅览
WANG Fei, HE Jinqi Northwest Power Construction Commissioning Institute. Analysis and optimization on run back control strategy for unit with CFB boiler[J]. Thermal power generation, 2013, 42(2): 74-81.
DOI:
WANG Fei, HE Jinqi Northwest Power Construction Commissioning Institute. Analysis and optimization on run back control strategy for unit with CFB boiler[J]. Thermal power generation, 2013, 42(2): 74-81.DOI:
Analysis and optimization on run back control strategy for unit with CFB boiler
On the basis of analyzing the run back(RB) control strategy of the 2×300 MW unit with CFB boilers in a power plant
the RB function of the primary air fan was canceled
and that of the secondary air fan
induced draft fan and feed water pump were reserved and optimized.During the RB tests for induced draft fan and feed water pump
the maximum furnace pressure was 822 Pa and the lowest steam drum level was-148 mm
which satisfied the requirements of unit RB.Moreover
to prevent the device overcurrent fault during the unit RB
the control should set the change rate of output instruction;it is better to set the device current as the control criterion when realizing the device overcurrent block increase protection.