Current service situation and retrofitting advices for tubes on final superheater in supercritical boilers
|更新时间:2025-09-28
|
Current service situation and retrofitting advices for tubes on final superheater in supercritical boilers
Thermal Power GenerationVol. 42, Issue 1, Pages: 1-4(2013)
作者机构:
1. 神华国华(北京)电力研究院有限公司
2. 神华国华太仓发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK223.32
Published:2013
稿件说明:
移动端阅览
ZHAO Huichuan1, SUN Biao1, YANG Hongquan2, et al. Current service situation and retrofitting advices for tubes on final superheater in supercritical boilers[J]. Thermal power generation, 2013, 42(1): 1-4.
DOI:
ZHAO Huichuan1, SUN Biao1, YANG Hongquan2, et al. Current service situation and retrofitting advices for tubes on final superheater in supercritical boilers[J]. Thermal power generation, 2013, 42(1): 1-4.DOI:
Current service situation and retrofitting advices for tubes on final superheater in supercritical boilers
摘要
通过对国产第一代超临界600MW机组锅炉末级过热器T23、T91、TP347H管材服役现状的分析
得出蒸汽氧化是影响锅炉末级过热器管材安全稳定运行的主要因素。对此
提出了基于管材抗蒸汽氧化温度进行设计选材的升级改造建议:T23钢管最高使用壁温应控制在570℃以内
T91钢管最高使用壁温应控制在600℃以内
壁温600~640℃的管段应选用经过内壁喷丸处理的TP347H钢管或细晶TP347HFG钢管。
Abstract
The current service situation of such materials as T23
T91 and TP347H steel used for pipes on final superheater of the first generation domestic 600 MW supercritical boiler was analyzed.Steam oxidation was considered as the major factor that affect the safe and stable operation of the final superheater pipes.The principles for pipe upgrading was proposed:the highest wall temperature of T23 steel pipes should be lower than 570 ℃;that of the T91 steel pipes should be lower than 600 ℃;while for pipe segment where the wall temperature is between 600 ℃ to 640 ℃
the TP347H steel after inner shot peening or fine-crystalline TP347HFG steel should be used.Several advices on material selection for steam oxidation resistance temperature based pipe retrofitting were proposed.
ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF
CAUSE ANALYSIS OF CONTINUOUS TUBE BURST ON HOLDING PIPES OF THE SCREEN-TYPE REHEATER FOR BOILER NO1 IN ONE POWER PLANT
CAUSE ANALYSIS OF TUBE BURSTS OCCURRED ON FINAL-STAGE SUPERHEATER OF BOILERS AND PREVENTION MEASURES THEREOF
OPTIMIZATION TECHNOLOGIES FOR PULVERIZED COAL BOIELRS OF HOME-MADE SUBCRITICAL 600 MW UNITS
Experimental study on mixed-burning lignite on a 1913t/h supercritical bituminous coal fired boiler equipped with LNASB
Related Author
WANG Chun-chuang21.Guangqian Electric Power Co Ltd
YE Shan-pei1
WU Kai Gansu Electric Power Science Research Institute
ZHAO Mingzhong
YANG Baixun1 1.Xi'an Thermal Power Research Institute Co Ltd