The modification that a subcritical 350 MW straight condensing unit was transformed into a steam extraction heat supply unit was presented
and the RB protection with quitting logic for the heating network during operation was analyzed.Results showed that
after heating network transformation
the RB protection action should be correspondingly changed:when the RB action for forced draft fans
primary air fans and induced draft fans occurred
add a 10-second delay for closing of the heating network quick closing valve and the check valve;to quickly open the motor operated adjusting butterfly valve LV