您当前的位置:
首页 >
文章列表页 >
Optimization on analog control system of a 330MW circulating fluidized bed unit
更新时间:2025-09-28
    • Optimization on analog control system of a 330MW circulating fluidized bed unit

    • Thermal Power Generation   Vol. 42, Issue 8, Pages: 107-111(2013)
    • CLC: TK323
    • Published:2013

    移动端阅览

  • ZHAO Zhidan1, WANG Zheng1, XUE Yi 2, et al. Optimization on analog control system of a 330MW circulating fluidized bed unit[J]. Thermal power generation, 2013, 42(8): 107-111. DOI:

  •  
  •  

0

Views

144

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION AND EFFECTIVENESS OF STARTING-UP WITH LOW BED MATERIAL IN CFB BOILER OF 300 MW UNITS
EMULATION STUDY ON MAIN STEAM PRESSURE CONTROL OF CFB BOILER BASED ON FUZZY MFAC COTROLLER
STUDY ON CHARACTERISTIC PARAMETERS IN THERMOCYCLING LOOP OF LARGE-CAPACITY CFB BOILERS
STUDY ON AND APPLICATION OF OIL-SAVING IGNITION TECHNOLOGY IN START-UP OF LARGE-CAPACITY CFB BOILERS
FEATURES OF PIPE-BLOWING FOR CFB BOILER AND STUDY ON ITS OPERATION MODE

Related Author

LIU Haifeng1
KONG Lingjia1
LIAO Peng1
WANG Zhiwei2
ZHANG Hong1 1.Datang Honghe Power Generation Co Ltd
LIANG Liu-tao
CHEN Tie-jun
CU Dan-danCollege of Electrical Engineering

Related Institution

Datang Honghe Power Generation Co., Ltd
School of Electrical Engineering, Zhengzhou University
Shenhua Shendong Electric Power Co., Ltd
North China Electric Power Research Institute Co., Ltd
School of Electrical and Power Engineering, Taiyuan University of Technology
0