您当前的位置:
首页 >
文章列表页 >
Auxiliary equipment adaptability for capacity enlargement of a 300MW unit
更新时间:2025-09-28
    • Auxiliary equipment adaptability for capacity enlargement of a 300MW unit

    • Thermal Power Generation   Vol. 42, Issue 3, Pages: 35-39(2013)
    • CLC: TM621.3
    • Published:2013

    移动端阅览

  • HUO Peng1, LIU Xinlong2, SHANG Guanggang2, et al. Auxiliary equipment adaptability for capacity enlargement of a 300MW unit[J]. Thermal power generation, 2013, 42(3): 35-39. DOI:

  •  
  •  

0

Views

133

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ON-LINE OPTIMIZED OPERATION OF THE CIRCULATING WATER PUMP FOR 300 MW UNIT
STUDY ON MEASURING METHOD FOR FLOW RATE OF AIR LEAKING INTO CONDENSER AND VACUUM SYSTEM
OPERATION OPTIMIZATION AND ECONOMIC EFFICIENCY DIAGNOSIS ON COLD END SYSTEM OF 300 MW UNIT IN SHAJIAO A POWER PLANT
THE INFLUENCE OF STEAM FLOW FIELD AT CONDENSER'S TUBEBUNDLE INLET UPON EXHAUST PRESSURE OF STEAM TURBINE
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT

Related Author

TIAN Xiao-dong
LIU Fu-jun Tangshan Thermal Power Co Ltd
JU Wen-ping
MA Ting-shan
YU Xin-yingXi'an Thermal Power Research Institute Co Ltd
XU Fangyou1
HU Guangming1
LIU Guangyao2

Related Institution

Tangshan Thermal Power Company
Xi'an Thermal Power Research Institute Co., Ltd
Guangdong Electric Shajiao A Power Plant
Huazhong Power Grid Co., Ltd
Datang Changshan Thermal Power Plant
0