Seal retrofitting and flow passage adjustment for steam turbine in a supercritical 600 MW unit
更新时间:2025-09-28
    • Seal retrofitting and flow passage adjustment for steam turbine in a supercritical 600 MW unit

    • Thermal Power Generation   Vol. 42, Issue 5, Pages: 90-92(2013)
    • CLC: TK263.2
    • Published:2013

    移动端阅览

  • WANG Xinyu1, QIN Shuwen2 1.North United Electric Power Co.. Seal retrofitting and flow passage adjustment for steam turbine in a supercritical 600 MW unit[J]. Thermal power generation, 2013, 42(5): 90-92. DOI:

  •  
  •  

0

Views

186

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Evaluation methods for turbine steam seal retrofitting
TECHNICAL FEATURES OF 900 MW STEAM TURBINES IN THE SECOND-PHASE OF WAIGAOQIAO POWER PLANT
A NEW METHOD FOR MEASURING AND ADJUSTING CLEARANCE OF STEAM SEAL GLAND
TECHNICAL FEATURES AND THERMAL PERFORMANCE TEST OF STEAM TURBINES FOR SUPERCRITICAL 900 MW UNITS
CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF

Related Author

FU Chang
NING Zhe
Feng Weizhong
XIONG Gang
FU Chang1
LIU Fa-can2 1.Xi'an Thermal Power Research Institute Co Ltd
CHEN Xing
LI Hong-pingXinyang Huayu Power Generation Co Ltd

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Waigaoqiao Power Plant Shanghai
Zunyi Power Plant Guizhou Zunyi
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Qinbei Power Plant
0