Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment
|更新时间:2025-09-28
|
Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment
Thermal Power GenerationVol. 42, Issue 7, Pages: 105-108(2013)
作者机构:
1. 神华国华(北京)电力研究院有限公司
2. 北京电联天时振动有限公司
3. 神华陕西国华锦界能源有限责任公司
4. 河北国华定洲发电有限责任公司
5. 神华内蒙古国华呼伦贝尔发电有限公司
作者简介:
基金信息:
DOI:
CLC:TK268
Published:2013
稿件说明:
移动端阅览
ZHANG Junjie1, CUI Yahui 1, ZHOU Feng2, et al. Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment[J]. Thermal power generation, 2013, 42(7): 105-108.
DOI:
ZHANG Junjie1, CUI Yahui 1, ZHOU Feng2, et al. Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment[J]. Thermal power generation, 2013, 42(7): 105-108.DOI:
Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment
The mechanism of gradual bend occurred on HP-IP(high pressure-intermediate pressure)rotor of the 600MW level unit was discussed.The viewpoint that the rotor was bended because of creep caused by gradual release of the residual stress when the equivalent stress exceeded the creep limit was put forward.The vibration data of two rotors under critical speed and the effect of counterbalance at different positions on vibration were analyzed.It summarized that such measures as weighting at both sides
returning to circle by turning
and shortage of correction mass at the middle of rotor can not restrain gradual rotor bending.A dynamic balancing method for restraining or stopping the continuous rotor bending was put forward
namely applying proper correction mass at the middle of rotor to decrease the equivalent stress in the middle high temperature region to the value below creep limit.