Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof
|更新时间:2025-09-28
|
Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof
Thermal Power GenerationVol. 42, Issue 7, Pages: 144-146(2013)
作者机构:
1. 华北电力大学电气与电子工程学院
2. 西安热工研究院有限公司
3. 江西省电力设计院
4. 国电九江发电有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2013
稿件说明:
移动端阅览
LI Ke1, ZHANG Chen2, XU Silong3, et al. Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof[J]. Thermal power generation, 2013, 42(7): 144-146.
DOI:
LI Ke1, ZHANG Chen2, XU Silong3, et al. Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof[J]. Thermal power generation, 2013, 42(7): 144-146.DOI:
Influence of single-line arrangement of auxiliary equipments on control system and optimization measures thereof
The No.7 660MW unit in Guodian Jiujiang Power Plant was the first domestic high parameter ultra supercritical 660MW unit with auxiliary equipments in sing-line arrangement that put into commercial operation.Optimization on single-line arrangement of the feedwater and airflue gas system was performed.By analyzing and summarizing the characterisitics of the singleline arrangement scheme for auxiliary equipments
the control system was optimized step by step.After the optimization
the system security
reliability
stability and convenience during operation and maintenance were dramatically improved.
OPERATIONAL CHARACTORS OF BOILERS EQUIPPED FOR ULTRA-SUPERCRITICAL 660 MW UNIT AFTER COMBINING THE BOOSTER AIR FAN IN DESULPHURIZATION SYSTEM AND THE INDUCED DRAFT FAN INTO ONE
COMPARISON BETWEEN TWO TYPES OF STEAM TURBINE FOR ULTRA-SUPERCRITICAL 660MW UNITS
Optimization of protection and control system of a 660MW ultra supercritical unit without desulfurization bypass
Type selection of pulverizing system under conditions of high altitude and low pressure
Control system design of single row configuration scheme of main auxiliary system in a 660MW unit
Related Author
CHEN Xing
ZHOU Liguo Datang Xinyang Hua'yu Power Generation Co Ltd
HU Kun
MA XuesongGuangdong Electric Power Design Institute
CHEN Yongcheng
ZHANG Feng
ZHU Tingyu
WANG Lei
Related Institution
Datang Xinyang Huayu Power Generation Co., Ltd
Guangdong Electric Power Design and Research Institute
Guangdong Honghai Bay Power Generation Co., Ltd
Nanjing Tairun Electric Power Engineering Co., Ltd
Beijing Guodian Zhishen Control Technology Co., Ltd