您当前的位置:
首页 >
文章列表页 >
Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures
更新时间:2025-09-28
    • Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures

    • Thermal Power Generation   Vol. 42, Issue 6, Pages: 78-81(2013)
    • CLC: TK229.2
    • Published:2013

    移动端阅览

  • LIN Mindu, GUO Jie, QIN Xichao Guangdong Yudean Jinghai Power Generation Co.. Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures[J]. Thermal power generation, 2013, 42(6): 78-81. DOI:

  •  
  •  

0

Views

195

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CONTROL STRATEGY OF PRIMARY FREQUENCY REGULATION AND ITS OPTIMIZATION FOR 2×600 MW ULTRA SUPERCRITICAL UNITS IN HEYUAN POWER PLANT
Exhaust coefficient method based analysis on influence of different spray desuperheating modes on unit thermal economy
Dynamic simulation model for ultra supercritical 1 000MW unit boilers
Steam temperature control during the unit startup with tiny-oil ignition
FEATURES OF MSW INCINERATION CONTROL IN STOCKER-FIRED BOILER

Related Author

WANG Yuanping1
WU Zhongsheng1
HUANG Huayu1
LI Enpeng1
YI Yongzhi1
HANG Yu2 1.Shenzhen Energy Hopewell Power(Heyuan) Co.
ZHOU Zhenqi1
LI Xiaodong1

Related Institution

Shenneng Hehe Electric Power (Heyuan) Co., Ltd
Northwest Electric Power Design Institute
School of Energy and Power Engineering, Northeast Electric Power University
Jilin Electric Power Co., Ltd. Siping Thermal Power Company
School of Control and Computer Engineering, North China Electric Power University
0