Energy consumption evaluation for start-stop process of a supercritical 600MW unit
|更新时间:2025-09-28
|
Energy consumption evaluation for start-stop process of a supercritical 600MW unit
Thermal Power GenerationVol. 42, Issue 7, Pages: 12-17(2013)
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2013
稿件说明:
移动端阅览
XU Fuying, JIANG Hao, LI Yang, et al. Energy consumption evaluation for start-stop process of a supercritical 600MW unit[J]. Thermal power generation, 2013, 42(7): 12-17.
DOI:
XU Fuying, JIANG Hao, LI Yang, et al. Energy consumption evaluation for start-stop process of a supercritical 600MW unit[J]. Thermal power generation, 2013, 42(7): 12-17.DOI:
Energy consumption evaluation for start-stop process of a supercritical 600MW unit
By investigation on the start/stop process of supercritical 600MW units
time consumption during the start/stop of 600MW level units was summarized.Taking a supercritical 600MW unit configured by Dongfang Boiler Group and Harbin Turbine Company as the example
the coal consumption
oil consumption
steam consumption and electric consumption during each start/stop process were evaluated and converted to the energy consumption and auxiliary power consumption rate.Thus
the energy consumption during the unit start/stop can be judged quantitively.The results showed that
the order of the influence quantity of the unit start/stop process on the coal consumption was small
and a more accurate estimation will not affect the results substantially.Therefore
this evaluated result was suitable for unit with various capacities.
Energy in a supercritical 600 MW unit with direct air cooling:consumption diagnosis and saving measures
ESTABLISHMENT AND ANALYSIS OF DYNAMIC MATHEMATICAL MODEL FOR EMULATION SYSTEM OF SUPERCRITICAL 600 MW ONCE-THROUGH BOILER UNIT
FEATURES OF COMMISSION DEBUGGING FOR HOME-MADE SUPERCRITICAL UNITS AS WELL AS ANALYSIS AND TREATMENT OF MAIN PROBLEMS
ANALYSIS OF VIBRATION PROBLEM FOR HOME - MADE 600 MW SUPERCRITICAL TURBO - GENERATOR SET AND TREATMENT THEREOF
FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
Related Author
FAN Yongsheng1
YUAN Ding2
JING Changcai1
XU Jiwei2
DONG Kun1
LI Yang3
JIANG Hao3
YU Xinying3 1.Shenhua Guohua(Beijing) Electric Power Research Institute Co.
Related Institution
Shenhua Guohua (Beijing) Electric Power Research Institute Co., Ltd
Shenhua Inner Mongolia Guohua Hulunbuir Power Generation Co., Ltd