您当前的位置:
首页 >
文章列表页 >
Equipment modification for lignite co-firing in a 600MW unit boiler
更新时间:2025-09-28
    • Equipment modification for lignite co-firing in a 600MW unit boiler

    • Thermal Power Generation   Vol. 42, Issue 8, Pages: 146-149(2013)
    • CLC: TM621.2
    • Published:2013

    移动端阅览

  • WANG Rong, AN Hongwen, WANG Liuhu Inner Mongolia Jing Long Power Plant Co.. Equipment modification for lignite co-firing in a 600MW unit boiler[J]. Thermal power generation, 2013, 42(8): 146-149. DOI:

  •  
  •  

0

Views

83

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Sealing system optimization for air preheater in a 600 MW boiler
Energy conservation analysis for waste heat utilization system applying air preheater and using primary air to heat condensate water
Numerical simulation on thermodynamic characteristics of air preheater bypass flue gas waste heat utilization system
Flow field in the upstream circular primary air duct of medium speed mills:numerical simulation and optimization design
Flue gas recirculation scheme for double-reheat boilers

Related Author

LIU Yongfeng
YU Dezhong
ZHANG Zhongzhou
CHENG Wei
WANG Jianhang
YAN Weiping
HE Dong
XIE Tian

Related Institution

Nanyang Yahekou Power Generation Co., Ltd
School of Energy Power and Mechanical Engineering, North China Electric Power University
Xi’an TPRI Energy Conservation Technology Co., Ltd.
China Energy Engineering Group Northwest China Electrical Power Test Research Institute Co., Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
0